// HEALTHCARE & DENTAL CLINIC PACK
Treatment rooms to compliance documentation.
Dental practices, GP surgeries, medical clinics, physiotherapy — compliance-grade procurement.
The Healthcare / Dental Clinic Pack consolidates the supply lines required to open a regulated clinical environment — treatment chairs, autoclaves, sterilisation, controlled drugs storage, reception, waiting area, infection-control supply and compliance documentation. Sourced from suppliers reviewed against CQC, MHRA and GPhC requirements where applicable. Compliance documentation collected per delivery as standard.
// 01 What's in the Healthcare Pack
Ten supply lines scoped to clinical-environment requirements.
Treatment chairs & couches
Dental chairs, examination couches, treatment recliners, physio benches — commercial-medical-grade with infection-control surfaces.
// INTAKE OPENSterilisation & autoclaves
Autoclaves, ultrasonic cleaners, sterilisation trays, instrument storage — HTM 01-05 compliant where applicable.
// INTAKE OPENControlled drugs storage
CD cabinets to BS 2881 / GPhC spec, locking pharmacy storage, refrigerated medicines storage, audit logs.
// INTAKE OPENReception & waiting
Reception desk, payment terminal, queue management, waiting area furniture, magazine racks, charging points.
// INTAKE OPENPatient privacy
Privacy screens, curtain tracks, soundproofing panels, signage for consultation-room confidentiality.
// INTAKE OPENDiagnostic & imaging
X-ray storage and shielding, dental imaging mounts, examination lighting, vitals stations.
// INTAKE OPENInfection control supply
Sanitisers, disposable PPE, glove dispensers, sharps bins, hand-wash stations, antibacterial surfaces.
// INTAKE OPENRecords storage
Patient records storage (where physical retained), locking cabinets, archive shelving, GDPR-compliant disposal kit.
// INTAKE OPENStaff areas
Staff lounge furniture, lockers, kitchenette, scrubs storage, training-room kit.
// INTAKE OPENCompliance documentation
CE / UKCA marking per equipment piece, electrical certification, autoclave validation records, fire-rating certificates — held against the procurement file per delivery.
// INTAKE OPEN// 02 The Procurement Flow
Five steps from intake to CQC inspection readiness.
Intake
Treatment-room count, clinical scope, regulatory authority, target opening, compliance documentation required.
Scoped Quote
1–5 working days — itemised quote with compliance-spec equipment, documentation timeline, lead-time confirmation.
Procurement
Orders placed across approved medical-trade suppliers. Compliance certification collected per item.
Delivery
Phased to fit-out and utility-readiness (gas / water / electrical). On-site installation coordinated.
Documentation Handover
Complete compliance file delivered with equipment validation records, certificates, autoclave commissioning — ready for CQC inspection.
// 03 How Archalign Operates for Healthcare Operators
Consolidated clinical procurement.
Healthcare operators source across treatment furniture, sterilisation, controlled drugs storage, infection control, reception and compliance documentation. Archalign consolidates these into a single managed procurement file with regulatory documentation collected per delivery.
Regulated supplier network.
Medical-equipment suppliers reviewed against CE / UKCA marking, HTM compliance, MHRA registration, lead-time consistency on critical equipment, and replacement responsiveness before integration.
Scheduled to inspection-readiness.
Heavy equipment during contractor fit-out (utility connections required). Sterilisation and storage next. Compliance documentation finalised before CQC inspection date.
Single procurement contact.
From initial scoping through CQC sign-off and ongoing supply of PPE, consumables, sharps bins and replacement equipment, clients work through a single procurement point of contact.
// REQUEST A TRADE QUOTE
Tell us about your healthcare / dental clinic.
One procurement desk for everything your commercial space needs — furniture, equipment, consumables, fit-out coordination. We respond with a scoped quote, lead times, and a delivery schedule keyed to your opening.